The Guigang cattle floor Gaga (Guangxi News Network)
net exposure Guigang downtown to Jingxian Government's response to the most
cattle floor Gaga said they had not punished for failing to receipt of the
report
NANNING, May 12 (Reuters) (Internet users concerned. Posts reflect Guigang
City downtown a seven-storey hotel built above a height of approximately
three-story building, unobtrusive and precarious.
Xinhua News Agency, local authorities but no one cares. In this regard, the
Guigang Housing and Urban Planning and Construction Committee, the explanation
given is not received reports from the public.
[core network things netizens exclaimed downtown plus Reporter from the post
the pictures to see the building, one called come to a very prosperous.
Posts triggered netizens great concern. Internet users,nike cheap sale, This building seems to
have tilted,Nike Shox
R4, and collapsed Who is responsible? The related administrative departments
of the government doing it? Managers why go? So blatantly not handle!
[the reporter] some of the building has been built for many years, while the
stamped part is built three years ago, people suspect that the stamped part of
the illegal construction, but it has not law enforcement agencies to intervene.
reporter on the scene saw the building Guigang bus station in in Guigang
downtown, opposite the building is less than 100 meters away from the building
is the the Guigang railway station, the building location in local belonging to
a crowded area.
building near the pharmacy, surnamed Su operators told reporters this
building three years ago,nike shox, were
stamped with suspected illegal construction, but has no one to be investigated
and dealt with. He believes that the urban construction department should
control one of this phenomenon, or will give nearby residents at risk.
surnamed Li in the public view, in the vicinity of the station building
affected the image of the city, he believes that the stamped part is too high,
there is a certain danger.
contact
phone calls from reporters to the hostel do the elevator machine room, the
construction of an additional two floors with elevator machine room is a total
of three.
Yang frankly stated that when stamped in the procedure, did not know the
formalities, has been the construction process and after the completion of
department to intervene.
[the Government's response] the Guigang lived Construction Commission: to
investigate not received reports reflect
many Internet users, this one stands in Guigang downtown Why three years,
regulatory authorities
the
China Network reporter came to the the Guigang housing and urban and rural
planning and construction committee, and for Internet users to the questions
raised, Guigang Housing and Construction Chief of Planning and Construction
Committee Liangzi Fei said: concerned about this issue that we approved or not
approved, doubt of his own heightening, that the public reporting obligations,
is not it? So far, no public oversight and reporting. Housing and Planning and
Construction Committee Chief Engineer Wang Myricaria told reporters that the
construction sector generally will not approve building heightening the building
have been taken into account in the design basis loads, the construction of
building heightening the load will risk.
Guigang Planning and Construction Supervision Detachment Vice Captains
ROCKETS said the original approval of this building is seven, the stamped part
of the examination and approval procedures, is a violation of illegal buildings.
[expert opinion] passive regulatory mentality intolerable
Guangxi Zhuang Autonomous Region District School associate professor Hui
pointed out that most cattle floor Gaga was so long in limbo, no investigation,
partly because of the publicity of relevant laws and regulations in place,
although the parties aware of related behaviors illegal, but taking into account
the environment for law enforcement is lax, so take the risk driven by the
interests.
more important reason is the supervision of the regulatory authorities in
place, the fear of hardship in the regulatory process. recognized that active
supervision is their own duty, and when the report from the masses is only an
auxiliary means, is a secondary aspect.
Zhang Hui suggested that relevant departments should establish a sense of
active supervision, to overcome the mentality of passive supervision. At the
same time,Nike Shox
NZ, strengthen the legal work of popularizing the same time, to establish
social supervision network, which can effectively avoid regulatory blind spots.
As of press time, Guigang of Housing and Urban Planning and Construction
Committee has indicated that an immediate investigation. For the further
development of this